For those customers who regularly visit Romsey branch you may have noticed some work taking place and wondered what was happening - well in short we have purchased the printers next door and Elliotts Romsey is almost doubling in size. Works are due for completion in the autumn and Kevin Dady, the branch manager, will keep you updated here via a regular blog.


|
17th August 2009
Hi all, since my last blog a lot has moved on. The self selection area has been shopfitted and the offices will be completed by Wednesday 26th. The kitchen and bathroom studio is well underway and many of the display's are nearing completion. The main yard has been re-racked and the new yard is now occupied with current stock line. The new stores are 95% complete with the repositioned stock lines and the final phase of the groundwork's has started with the levelling and re-concreting of the old roadway.
As from Monday the 24th we will be using the new goods inwards entrance, to enable us to close and redevelop the existing roadway. Our move date for the self selection and kitchen / bathroom studio is set for the weekend of 4th-6th September and we will start trading from the new site on Monday 7th September. We will then be gutting our existing shop and showroom to transform it into a large general store during September. Hopefully all works will be completed by October.
6th August 2009
Things are still on track. The new racking is being installed in the yard and the new goods inwards gateway has been completed. The relevelling of the sideway is underway and the concreting is due to commence next week.
Within the new self selection and showroom area the ground floor is nearing completion with the floor prep due next week and the installation of the new stairway is underway. The upper floor area is a hive of activity with the kitchen and bathroom displays being fitted.
23rd July 2009
The main contracts are well on track, with the civil engineers now tackling the re-levelling and widening of the sideway, the new good inwards entrance and gateway are under construction. On the ground floor self selection area the ceiling has been fully installed and the decoration nears completion, floors are due for prepping before recoating. On the upper floor showroom, progression is being made installing the kitchen and bathroom display's.
9th July 2009
Since my last blog the old stores have been totally demolished and recycled. Progression has been steady with the concrete bays being poured to form the new yard surface. The new "ELLIOTTS" cladding has been completed to the new shop with the windows and doors being installed this week. The showroom fitment has commenced and should take about 8 weeks to complete. All walls have been constructed and finished, carpet and flooring is being laid throughout to enable the placement of displays which will commence next week - 12 kitchens, 13 bathrooms and 8 showers in all. We have full use of the new carpark and a new entrance to the rear yard via the side of the new building.
25th June 2009
Work on the redevelopment is running to schedule, the demolition of the old stores has been completed and the reconcreting of new yard is in progress, first fix is well underway in the shop and showroom and the new suspended ceiling grid / tiles are in place. External cladding of the showroom should be completed by the end of next week. This should be followed by the installation of new windows and doors.
11th June 2009
We are now a month into the refurbishment at Romsey and things are starting to take shape:
1st June 2009
The car park moves into the new site, so demolition work can start on the front of the old site
26th May 2009
Plaster and cement store moved onto the new site
30th April 2009
HMF moved in and building works commenced
|